Wastewater Overflow Notice

On April 2nd, 2026, a wastewater overflow occured at the Lift Station at the Wastewater Treatment Plant on Gaede Road.  The overflow DID NOT result in any exposure to human health, and the public WAS NOT at risk.

– Jake Guth, Certified Operator.