Wastewater Overflow Notice

On April 15th, 2026, a wastewater overflow occurred at the Lift Station at the Wastewater Treatment Plant on Gaede Road.  The overflow DID NOT result in any exposure to human health, and the public WAS NOT at risk.

/Jake Guth, Certified Operator

posted 4/22/2026 dmh